Sign In | Join Free | My frbiz.com
China ChangSha Zoomwolf Machinery CO.,LTD logo
ChangSha Zoomwolf Machinery CO.,LTD
ChangSha Zoomwolf Machinery CO.,LTD
Active Member

7 Years

Home > Concrete Placing Boom >

380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing

ChangSha Zoomwolf Machinery CO.,LTD
Contact Now

380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing

Brand Name : Zoomwolf

Certification : ISO9001

Place of Origin : Changsha,China

Model Number : HGY29,33

product : Concrete Placing Boom

Column length : 5m,8m,10m

Function : Construction Buildings

Feature : High wear resistance bend

Voltage : 380V/50HZ

MOQ : 1 Set

Price : Negotiable

Packaging Details : Large structural parts are bundled,Small pieces are packed in iron cases.

Contact Now

380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing

Features
Optimal design of boom-&column-structure ,Inner hydraulic oil tank renders a compact placement.

The key components of hydraulic- and electrical-system are from world famous brand,which ensure safety and stability.

For option:
1. Standard types without counter weight
2. Floor or shaft climbing
3. Step speed or stepless speed(proportional control)
4. Column length:5m,8m,10m
5. Delivery pipes for option as project budget:
⑴ Ordinary single straight pipe and cast steel bend,service life not more than 20,000m3 ;
⑵ High wear resistance double straight pipe and bend,service life not less than 50,000m3;

Technical Specifications
Model of placing boom HGY29S-3R HGY29P-3R HGY29SC-3R HGY29PC-3R
Performance Max. radius (m) 29
Free standing height, 22.7m,400°
Slewing range
Working temperature(℃) 0~60℃
Counter weight(kg) / 2930
Total weight(kg) 19100 22030
Supply power to equipment 380V/50Hz
Electric motor Motor model Y2-160L-4
Power(kW) 15
Hydraulic system System pressure(MPa) 32
Flow(L/min) 18
Oil tank capacity(L) 280
Control mode (Cable+Radio) remote control
Clearing mode for concrete pipe Water clear / Dry clear
Section of tubular column (m×m) 0.75×0.75
Arm(Booms) Boom model fully hydraulic foldable arms
Delivery pipeline diameter DN125mm
Length of end hose (〃×m) 5〃×3
The first section Length(m) 10.9
Articulation -2.5°~82.5°
The second section Length(m) 9.6
Articulation 0°~180°
The third section Length(m) 8.5
Articulation 0°~180°
Climbing Climbing mode Cylinder jack lifting
Internal climbing step distance(m) 0.52
Floor Frame Hole prepared in floor
Shaft Frame Size of climbing shaft : 2.0m-2.7m
Min. space between internal climbing frame Climbing(m) 3
Placing concrete(m) 6
Rest(m) 6

Maintenance of concrete placing boom

Remote control and electric control system: waterproof, anti-magnetic, anti - impact.

Lubrication point: add lubricating oil regularly.

Hydraulic oil and hydraulic system: anti-pollution, anti-emulsification, often pay attention to the tank level gauge.Once the hydraulic oil is contaminated or emulsified, the placing boom must be stopped immediately and all the hydraulic oil replaced. If the liquid level gauge shows insufficient oil, be sure to fill up.

Conveying pipe: conveying pipe inner wall with concrete direct contact and relative movement, will cause wall wear.When the wall thickness gradually reduced to a certain extent, will not withstand the pressure of the concrete inside the pipe leading to burst, and even cause safety accidents!Therefore, when the placing boom has been used for a long time and the concrete content of the conveying pipe reaches 50% of the conveying pipe life, it is necessary to check the thickness of the pipe wall as a daily work.

Daily cleaning of spatter concrete: due to the frequent spatter of concrete falling from the upper floors, damage to the internal climbing devices (especially the jacking cylinder) must be cleaned frequently, so that the concrete cannot accumulate and condense. Therefore, it is suggested that under the premise of not affecting the normal work, try to cover the internal climbing device to prevent it from being polluted by concrete.

380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing

380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing

About the model

HGY ×× S or P C or blank - × R

① ② ③ ④ ⑤

① Hydraulic concrete distributor

② Round number of Max.radius(m)

③ Step speed regulation(S)or

Proportional control speed regulation(P)

④ With(C)or without(blank) counter weight

⑤ Arm section number ×Roll folding(R)

Identification letter description

S: Step-speed adjustment

P: Proportional (Stepless speed regulation)

C: Counter weight

The sample

1. Model HGY33S-3R means:

Without counter weight,max.radius 33m,step speed regulation and 3 roll-folding arms.

2. Model HGY33PC-4R means:

With counter weight,max.radius 33m, proportional control speed regulation and 4 roll-folding arms.

380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing


Product Tags:

concrete placement boom

      

boom pressure concrete machine

      
China 380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing wholesale

380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: ChangSha Zoomwolf Machinery CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)